The Great LSM Twins Group Build ends July 3, 2024
×
-
Posts
4,422 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Gallery
Posts posted by JeroenPeters
-
-
-
Busy with the HGW harnesses. This usually takes me three evenings. Almost done. Just need to drape and glue the straps into position. And then seal it all in with matt varnish, followed by a wash.
The drawing shows an early Sutton harness and how it was attached. No Whirlwind but probably quite similar.
- 10
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1/32 Westland Whirlwind
in LSM 1/35 and Larger Work In Progress
Posted
Pit as good as done. One thing missing from the Quinta set is the oxy regulator on the right sidewall. I took that of the Kitsworld set.