Jump to content

CP1

Members
  • Posts

    527
  • Joined

  • Last visited

Everything posted by CP1

  1. Adding water to fountain. This will be done in a few layers allowing for curing time over the next few days
  2. Weathered road, sidewalk and added debris
  3. Thanks…just waiting on some diorama items to arrive. The interior of the cafe will have five tables with chairs and a wall cabinet with coffee cups and bottles . The second floor will be an office.
  4. Painted installed railing
  5. Adding railing
  6. Changed the clock support to make it stronger and added light above door
  7. Finished door and lower windows. Now work on upper floor
  8. Making window frames
  9. Roadway grouted
  10. All done with roadway
  11. Three long days putting that road together. Now I just need to finish one end. Tomorrow I will start to paint the building 🤪
  12. Over 5000. The worst part is filling the ends.
×
×
  • Create New...