Jump to content

CP1

Members
  • Posts

    418
  • Joined

  • Last visited

Everything posted by CP1

  1. Applying dirt and ballast
  2. Added top coat which will crack as it dries
  3. Making concrete slab
  4. Going to make a concrete roadway along the loading dock and approach to the switch tower
  5. Making concrete ramp to maintenance shed
  6. Making concrete walkway
  7. Going to add 88 flak gun gondola in front of locomotive and a flat car with a Tiger tank. Ordered some tie down chains from Ireland for the vehicles being transported.
  8. Going to add a walkway across tracks
  9. Glued track down. Waiting for a Frei crane. Start painting wall tomorrow.
  10. The second story of the switch tower will have a full interior as will the maintenance shed.
×
×
  • Create New...