Jump to content

CP1

Members
  • Posts

    413
  • Joined

  • Last visited

Everything posted by CP1

  1. still need to paint doors and finish roof. Going to add some details on second floor.
  2. I might add some miniature lighting to this model
  3. Burned out for now…reason to start a new one…
  4. The second floor on the switch tower will have an interior. I will also detail the interior of the maintenance shed.
  5. Waiting on another German steam engine, the switch and a lot of figures.
  6. going to add another light pole on the opposite side of the walkway
  7. I found a company that makes a 1/35 scale switch. Ordered from Poland. Still waiting for maintenance shed. Got crane today. Will add it near the platform. I may have bought too many railroad cars😬
  8. Be careful…you might enjoy it but your wallet won’t🤣😂😱
  9. Waiting for more track and platform crane. Going to curve a portion of the track. Waiting for maintenance shed. There will be a stairwell connecting the walkway with the tower. Still need to finish the walkway railing.
×
×
  • Create New...