Jump to content

CP1

Members
  • Posts

    472
  • Joined

  • Last visited

Everything posted by CP1

  1. weathering ground
  2. Applying dirt and ballast
  3. Added top coat which will crack as it dries
  4. Making concrete slab
  5. Going to make a concrete roadway along the loading dock and approach to the switch tower
  6. Making concrete ramp to maintenance shed
  7. Making concrete walkway
  8. Going to add 88 flak gun gondola in front of locomotive and a flat car with a Tiger tank. Ordered some tie down chains from Ireland for the vehicles being transported.
  9. Going to add a walkway across tracks
  10. Glued track down. Waiting for a Frei crane. Start painting wall tomorrow.
×
×
  • Create New...