Jump to content
The Great LSM Twins Group Build ends July 3, 2024 ×

1:64 HMS Indefatigable (1794) - prototype for Vanguard Models


James H

Recommended Posts

  • Administrators

A little history (edited from wiki!)

 

HMS Indefatigable was one of the Ardent-class 64-gun third-rate ships-of-the-line designed by Sir Thomas Slade in 1761 for the Royal Navy. She was built as a ship-of-the-line, but most of her active service took place after her conversion to a 44-gun razee frigate. She had a long career under several distinguished commanders, serving throughout the French Revolutionary Wars and the Napoleonic Wars. She took some 27 prizes, alone or in company, and the Admiralty authorised the issue of four clasps to the Naval General Service Medal in 1847 to any surviving members of her crews from the respective actions.

 

Indefatigable was ordered on 3 August 1780 (long after Slade's death), and her keel was laid down in May 1781 at the Bucklers Hard shipyard in Hampshire owned by Henry Adams. She was launched in early July 178,  and completed from 11 July to 13 September of that year at Portsmouth Dockyard as a 64-gun two-decked third rate for the Royal Navy. She had cost £25,210 4s 5d to build; her total initial cost including fitting out and coppering was £36,154 18s 7d (around £6.6m in today's money). By that time, she was already outmoded for the role of a ship of the line as the French only built the more powerful 74-gun ships, and she was never commissioned in that role.

 

She was broken up in 1816.

 

The kit
This is quite literally hot off the press with regards to what you see here. Indefatigable is being represented in this new kit as the razée, and quite rightly so. I do have a lot of affection for the stuff built at Bucklers Hard, having visited there a couple of times myself. It's a beautifully tranquil place in England's New Forest, which really does betray the hive of activity it used to be. It even has the original shipwrights houses and the pub there, as part of the tour. Just to think, Indefatigable was definitely built in one of these two slips, as was Agamemnon etc. I took these photos a couple of years ago.

 

IMG_0634.jpg

IMG_0635.jpg

IMG_0630.jpg

 

This is very stuff for Indefatigable, as all I currently have are the cannon, carronades, and also the cutter. It will also become very obvious that when building these models, I never do anything in chronological order as seen in the manual. I work on whatever Chris has completed and sends over to me, with other work infilling between main tasks. I try to waste as little time as possible in order to keep to fairly tight release schedules. For the first time you'll see me work on stuff like this before the big hitters are sent to me. Even then, I will feed back with my findings and things will possibly be changed to reflect my own build. 

 

Not too much to see at the moment, and work won't start proper for a week or so, so keep checking in to see if things have progressed. Here's the two sheets of 2mm pear which contain the gun carts...

Untitled-1.jpg

DSC_9606.jpg

DSC_9607.jpg

DSC_9608.jpg

 

I also have three bags of guns. These are:

  • 12-pound long
  • 24-pound long
  • 42-pound carronades

 

I do need to wash these guns in some isopropyl, especially the carronades as the initial washing left then with tissue debris on them. Also, the carronade carriages will also have 3d-printed wheels! 

DSC_9615.jpg

DSC_9611.jpg

DSC_9612.jpg

DSC_9613.jpg

DSC_9614.jpg

 

Indefatigable will have many of the design traits of Sphinx, but this time incorporate more traditional planking around the upper bulwarks and gun ports etc. Indy will also feature a traditionally planked deck too. 

 

Here are the parts for the cutter:

 

DSC_9609.jpg

DSC_9610.jpg

  • Like 4
Link to comment
Share on other sites

  • Administrators

Time for a quick update. This will be the last one before work starts very shortly.

 

I'm making this update over TWO posts due to number of pics. These are just camera photos and won't represent anything you see in the manual.

 

Indy turned up with UPS this morning, and the box is large and heavy. In fact, the box isn't large enough yet as the masting, rigging, manual and plans also need to be included, as well as PE etc. The box was packed out as it was. This one took up two seats on my sofa.

 

IMG_0213.jpg

IMG_0214.jpg

IMG_0215.jpg

IMG_0216.jpg

 

Take a look through and you'll notice some little things here and there. One of those is that the main gun deck carriages are tabbed so they slot into the deck and can't be knocked free later in the build. This is only an optional feature as the modeller can, if they wish, plank over the tab slots and remove the tab from the carriage. That would be up to the individual but this is a perfectly good solution that will be invisible when implemented. If also means the guns will be perfectly spaced too and the barrels therefore evenly protrude from the hull. Those barrels will also be fitted after the hull is painted, so attaching them later won't dislodge a gun cart.

IMG_0217.jpg

IMG_0218.jpg

IMG_0219.jpg

IMG_0220.jpg

 

This is the engraved maple deck which won't be included as standard, unlike the other kits. This kit will have traditional planks for the deck, but it is quite likely that this option will be provided on release. If that happens, then the gun carriage location slots aren't likely to be there, and you'll simply open them up if you want use that kit feature. Oh, these parts are BIG!! My cutting mat is in 1cm squares, as a guide.

IMG_0221.jpg

 

 

Not fantastically clear here, but the ply sub decks are engraved with planks. This isn't the finish. It's designed to give you a template onto which to lay the kit planks. That will save the modeller having to mark up stuff themselves.

IMG_0222.jpg

  • Like 5
Link to comment
Share on other sites

  • Administrators

Continued. 

 

I've grouped most of these photos into thickness of sheet, and there are a lot of various thicknesses with multiple sheets for them. You can see the tabbed gun carts here too. Those tabs are on the forward 'bulkhead', closest to the inner bulwarks.

 

IMG_0224.jpg

IMG_0225.jpg

IMG_0226.jpg

IMG_0227.jpg

 

 

You're going to have to make FIVE ship's boats for this one!

 

 

Inner bulwarks are split into three sections to cover the entire length. There will also be doorways from the cabin into the quarter galleries. 

IMG_0228.jpg

IMG_0229.jpg

IMG_0230.jpg

IMG_0231.jpg

IMG_0233.jpg

 

 

;) 3D printed stuff, like belfry, anchors etc. and I do see some copper tape there too.

IMG_0234.jpg

 

 

Quirks of prototyping. Various cabin floor sections. 

IMG_0235.jpg

 

 

LOTS of strip too.

IMG_0236.jpg

 

 

Decals for name and depth markings. Also, there is no white edge on that text. It's merely the light catching the ink edging! I have checked.

IMG_0237.jpg

IMG_0238.jpg

  • Like 5
Link to comment
Share on other sites

  • Administrators

Work has now begun.

 

First, the obligatory disposable cradle shot 😃

3.jpeg

 

 

Indy certainly isn't short of bulkheads. There are 18 in total, with #9 midships being a double layer bulkhead. There are no bevel marks on Indy. They simply aren't needed for a kit of this level. Fairing will be an easy task. All bulkheads are 4mm MDF, as is the keel.

6.jpeg

7.jpeg

 

The keel slots are numbered too so you get things in the right place.

8.jpeg

 

 

Indy is a strange build in that practically all you see in this update, with the exception of lower deck/orlop detail, can be assembled initially with no glue. All bulkheads you see being added here are put into position as such.

10.jpeg

11.jpeg

 

 

Now this is where the magic happens. Once all bulkheads (apart from #1, #2, #15, #16, #17 and #18 because they aren't needed yet) are slotted into their position, these keel doublers are added, bulking out the keel to 12mm! What these do is to hold the bulkheads in their exact position. while pegs slot through the holes to lock everything into position. Zero glue apart from the pegs themselves.

13.jpeg

14.jpeg

 

 

Bulkheads #15, #16 and #17 are now added because the fairing parts will now lock them into position as with the other bulkheads.

18.jpeg

21.jpeg

 

 

 

Bulkheads #1 and #2 are now fitted, but NO GLUE at this time. The fairing patterns are now added. You will see these as No.s 37, 38 and 39. Like the others, these are pegged into place.

24.jpeg

26.jpeg

 

 

 

Is there an orlop deck? There certainly is. This is it 😆
Nothing more is needed. In fact, you'll probably not even see this without an endoscope. This part is glued into place. 

28.jpeg

 

 

The 3mm MDF sub deck is now fitted. Care needs to be taken around the bulkhead ears. You should have no problem....just don't go charging in. To fit this, I ran some Titebond down the 12mm wide keel centreline. Nothing here needed to be weighted down or pinned. It fit perfectly with a reassuring push.

30.jpeg

33.jpeg

 

 

 

Pegs are now pushed into position which give a further aid to making sure everything is level.

35b.jpeg

 

 

At this stage, things look like this:

38.jpeg

  • Like 8
Link to comment
Share on other sites

  • Administrators

This photo shows the standard ply engraved section for the lower deck. As I've said, you'll be hard pressed to see this stuff, unless you're an ant that's crawled in. But in case you are, or have that endoscope I mentioned, the detail is there in part. Here you see the ply engraved part along with the optional maple deck section which I have opted to use for this build.

 

The deck section is now glued into place.

39b.jpeg

40.jpeg

 

 

Two, 2-part grates are now built and added.

41.jpeg

43.jpeg

44.jpeg

 

 

And of course, you'll need some steps down to the dinky orlop deck.

45.jpeg

48.jpeg

50.jpeg

51.jpeg

 

 

 

These two beams are now added, again without glue.

52.jpeg

54.jpeg

 

 

 

These two beams hole them firmly in place and are located with two pegs each, glued into the slots.

56.jpeg

57b.jpeg

58b.jpeg

 

 

 

And lastly for this update, a whole raft of deck beams are fitted between those two longitudinal parts.

59.jpeg

60a.jpeg

60b.jpeg

  • Like 6
Link to comment
Share on other sites

  • Administrators

Small update as I hated leaving it without a bow and stern from the last update 😁

 

First, the bow. The foremost 'timberheads' near the prow are pear inserts to the MDF former so there's lots of strength up front when later work is carried out.  Bulkhead #1 is temporarily fitted to the hull and then the formers are fitted in. The reason for doing this on model is so I can get the innermost formers snug against the keel. All these parts are numbered and the relative slots on the bulkhead are numbered too.

 

61.jpeg

63.jpeg

69.jpeg

 

 

 

The assembly is now removed from the hull before the outer formers are set and the upper parts (35) are glued into place as seen here. Too stiffener pieces are also glued to the exposed side of the pear inserts. The assembly is now left to properly dry.

71.jpeg

73.jpeg

74.jpeg

 

 

 

A sanding block is now taken to the bow and the whole lot is sanded and shaped in readiness to fit to the hull. The back side of this also hooks onto bulkhead #2. When I was happy with this, it was glued to the hull.

75.jpeg

76.jpeg

 

 

 

 

It's now the turn of the stern and fitting out the final bulkhead. As with the bow, this is fitted with a series of formers that are numbered in relation to the bulkhead slots. It's a no-brainer!

77.jpeg

79.jpeg

 

 

 

 

This is now carefully sanded to shape. It will doubtless be refined later when it comes to fairing the hull. Once happy with it, it's glued onto the hull.

80.jpeg

81.jpeg

 

Until later!

  • Like 5
Link to comment
Share on other sites

  • Administrators

Time for another Lego update.

 

Next job was to bolster those bulkhead ears by adding the gun ports. As with Sphinx, these are built into the frame. The main gun deck longitudinal frames lock into the bulkheads and comprise two parts upper per side, and two parts lower. Lower in first of course.

 

84a.jpeg

85a.jpeg

86a.jpeg

87a.jpeg

89b.jpeg

91a.jpeg

 

 

 

 

The vertical gun port frames now need to fit in. These are all specific, to suit the curve of hull. Each port has two verticals apart from #7, as that one uses the side of a bulkhead for the other vertical.

92a.jpeg

94.jpeg

 

 

 

The main gun deck ply layer is pre-engraved to help you with laying the planks. It's also supplied in halves, to make it easier to fit. Both deck halves are turned upside down and a strip of narrow tape is applied full length, and then the various openings cut out. The deck is then turned over and bent down the tape hinge before being glued into place. Deck edges lock into slots in the base of the bulkhead ears, so there's no problem with it popping up. It's just a case of making sure it's glued down across the deck beams and then weighted down while it dries. No need to pin anything here.

97.jpeg

98.jpeg

  • Like 3
Link to comment
Share on other sites

  • Administrators

Continuing today's update:

 

Time to get rid of that blank section in the last bulkhead. That was there to protect the bulkhead while work was being done on it with shaping the stern. A gentle twisting removes this from the hull.

99.jpeg

 

 

 

Time for the stern timbers to be fitted. These slot across the rear two bulkheads, creating the correct angles for the parts. They also sit on the shaped stern upper block. First the inners, then the middles, followed by the outers.

101.jpeg

102.jpeg

103.jpeg

 

 

 

Some filler blocks are now added to the outside of the outer timbers, creating the rest of the platform and something to plank to also.

108.jpeg

 

 

 

Those fragile rear bulkhead ears are now bolstered with the addition of more longitudinal strips, all slotted to fit. The gap you see between some of them is to house the fore bulkhead screen. That's designed so you get zero gaps. You'll see that later in the build.

112.jpeg

116.jpeg

 

 

 

Door frames are added from the captain's cabin to where the quarter galleries will eventually fit. Once dry, the inner horizontal parts of the frames are cut out. 

118.jpeg

120.jpeg

 

 

 

Part of bulkhead 18's ear is now cut out as this is the only one that would obstruct the gun port. That is sawn out and filed flush before the last gun port frames are glued in.

121a.jpeg

121b.jpeg

123.jpeg

 

 

 

To create a rigid structure for fairing, the rear of the hull has some temporary MDF sections that are held in place with pegs. These are totally solid and shouldn't come loose. 

125a.jpeg

125b.jpeg

126.jpeg

 

 

And that is it for today. I'm whacked!

  • Like 2
Link to comment
Share on other sites

  • Administrators

Another update.

 

Not too much to show this time, but there was a lot of work in terms of sanding and waiting for soaked parts to dry before gluing etc.
Before I could proceed, I needed to sand the inner bulwarks. This isn't too bad of a job...just time consuming. Despite my pic, you're best rolling the hull onto its side on a towel, and applying pressure downwards when sanding. This is done until everything is nice and even.

 

127.jpeg

 

 

 

 

Each 1mm interior bulwark is split into four easy to manage sections. To lessen any load on the frames, so as not to cause any spread in them, all inner bulwark parts were soaked for 30 mins before clamping into place until dry. These were left 24hrs so they were entirely back to their normal size. Pear swells a lot in water, so it's vital you know, beyond doubt, that there's no swelling left. Once dry, all parts were carefully aligned to the port frames, glued into place, and clamped until set.

129.jpeg

130.jpeg

131.jpeg

132.jpeg

 

 

 

 

Provision now needs to be made for the eventual deck beam positioning. This is done using some 2mm MDF frames which slot into the bulkhead beams, above the inner bulwarks. There are two per side. These fit with a nice, reassuring push, but at this stage I don't glue them.

135.jpeg

136a.jpeg

137.jpeg

138b.jpeg

 

 

 

A good number of the 6mm pear deck beams and 5mm boat beams are now sotted/hooked over the MDF parts I just installed. This is done to check that the position of those MDF parts are absolutely in the right place. These beams are NOT glued in yet, obviously. At this point I've also reinstated the MDF temporary beams across the quarterdeck bulkheads. Again that's just to make sure every dimension is exactly as designed.

139a.jpeg

139b.jpeg

140a.jpeg

140b.jpeg

 

 

 

 

Once happy with everything, the MDF deck beam mounts are brush glued into place.

141.jpeg

 

 

 

 

Lastly, the pear beams are removed and carefully put away somewhere safe. The temporary MDF beams remain in place to help me with the hull fairing, and that's the next job.

142.jpeg

 

 

That's all for now.

  • Like 4
Link to comment
Share on other sites

  • Administrators

Just for some info, Indy will be approx 880mm tall.

 

Ok, onto business.

 

The hull is now faired. This isn't really a task you can sit there with a piece of sandpaper and hope to achieve inner calm. Chris finally talked me into getting a palm sander (mouse), so I splashed out on a Black & Decker one. Even with this, fitted with an 80 grit pad, this job still took me a total of about 5 hours, along with the final task of wrapping some sandpaper around a 12 inch piece of thin ply to absolutely ensure the curves were right....plus the joyous task of blending those last bulkheads and fairing blocks into the keel.

 

 

144a.jpeg144b.jpeg

 

 

 

 

There is a lot of regular planking on Indy, but the inner core of the outer bulwarks are laser cut. So as not to stress out the forward bulwarks and those temporary gun port sections, these were first soaked and clamped in place. These were left for a full 24hrs to dry out and shrink back to their normal size. Pear has a hell of an expansion, even when soaked for 30 mins in hot water, so you really need to find a book to read, guitar to play, or TV to watch while this dries.

146.jpeg

 

 

 

 

 

Now that the parts are completely dry, I draw around the forward position of the bulwark so that I have my positions for the flow of the first plank that runs below the gun ports, and also the extent of the planks above this. It's important to know here that this pear part sits along the top of the gun ports on the main deck.

147a.jpeg

147b.jpeg

 

 

 

The pear bulwark is now removed and the first 1.5mm thick lime strip laid along the bottom edge of the gun port sills, and along the lower line I've just drawn. On the prototype, each plank is 500mm long, and they meet up on the double thickness bulkhead #9. We're not yet sure if that will be the case on the final product.

 

148.jpeg

 

 

 

 

 

The back end of the same plank run is now installed. These planks are pinned until dry. If you pin all the way through, they will penetrate through the inner bulwarks, but that doesn't matter as any holes will be in the area covered by the spirketting. 

149.jpeg

 

 

 

 

 

The pear bulwark sections are now temporarily clamped into position so the bottom edge runs along the top edge of the gun ports. You don't need top do this but I just considered that it was good insurance that the plank that runs directly underneath these pear parts, would be properly installed and a snug for in that area.It also gives you something to finally sit these parts onto later so you have a much better chance of both sides being exactly equal. Care is taken not to get any glue on those pear bulwarks. The spaces between the gun ports are now filled up with lime strip. This doesn't need to be neat at this stage. They'll be cleaned up later.

155.jpeg

 

 

 

 

 

A razor saw is now used to cut away the lime strip in the top row, that is partially obscuring the gun ports.

156.jpeg

 

 

 

 

 

The pear bulwarks can now be reinstated, but before this happens, you need to know a little bit about the side framing of the rear half of Indy. Not all of it will become a part of your finished project. When it comes to gluing the rear sections on first, the area in red here WILL NOT have any glue applied to it as that section will later be cut away. You can see the area with glue covers the the lower area just underneath the red area and for the rear section, it terminates at the point where the longitudinal strips were installed in sections. When you look at the model and my previous photos (without red marks), you can see that split in the strips, denoting the two areas.

157.jpeg

 

 

 

 

 

The rear bulwarks are now finally glued into position after some final measuring, ensuring both sides are in exactly the same position. This isn't too difficult now that this part sits upon that lime plank. Other factors also help too, such as the two rear gunport frames on the quarterdeck and the quarter gallery doorway. Just check at the back end to make sure things align with the stern timbers. Of course, you don't need to worry about gun port alignment on the rest of the quarterdeck gun ports as those frames will later be removed, as discussed. 2 inch clamps are very useful here to make sure the bulwark is squeezed into the hull curvature, as they can hook through the gun ports. 

158.jpeg

 

 

 

 

 

The mid and fore pear bulkheads are now glued into place.

159.jpeg

 

 

 

 

And for the last part of this update, here's how she currently looks. Next job is to cover that lower real estate in lime planks. Remember, this is the same size as Agamemnon!

160a.jpeg

160b.jpeg

 

 

Until next time....

  • Like 4
Link to comment
Share on other sites

  • Administrators

Not great photos, but I have been asked several times about the size of Indy compared to Amati's 1:64 Victory prototype, so here's a couple of photos for you.

 

Remember that the angle of the first pic makes Indy look bigger than Vic. It isn't! That's why I did a photo of Indy sat on Vic's lower gun deck.

 

DSC_1006.jpg

DSC_1007.jpg

  • Like 3
Link to comment
Share on other sites

  • Administrators

Not a massive update, and there have been two prow reworks to get it spot on.

 

That held me up a few days in total, plus my health hasn't been conducive to extended workshop sessions. Anyway, the hull is now fully first planked in 6mm wide strips of 1.5mm thick lime. For me, that's the king of my least favourite parts done, next to sanding it! I used a combination of palm sander and manual muscle/sweat to clean up the planks. After that was done, I opened up the gun ports so they are almost at right size.

 

162.jpeg

163.jpeg

164.jpeg

 

 

 

 

The inner, side bulwarks are left a little long so they can be trimmed exactly to your own build. To level up to the stern timbers, I use a rule and pencil to drawn an extended line from the stern timbers, then trim/sand to the correct length. The lower, curved area etc. are also trimmed back to the stern timbers.

165.jpeg

166.jpeg

 

 

 

 

This little part sits across the inside of the stern timbers. It will later have a shelf sat on top which will help with its placement. Here it is fitted.

167.jpeg

168.jpeg

 

 

 

 

To make things easier later on in the project, three poop deck beams are slotted into place (#1, 5, and 10) so I can temporarily fit the poop deck. This will help you sand the back edge to the same as the stern. Even though I show/include this, on my prototype it fit without needing any sanding at rear.

170.jpeg

171.jpeg

 

 

 

 

The quarter gallery frames are now built up...well partially. These will soon be temporarily fitted to help with the vital positioning of the stern elements (stern face, middle and lower counters).

176.jpeg

 

Until next time...

  • Like 6
Link to comment
Share on other sites

  • Administrators

Let's bring this up to date.

 

Another element that needs to be temporarily fitted is the shelf that sits in the rear of the day cabin, encompassing the rudder housing.This piece slots into the stern timbers and needs to be pushed the whole way in so the whole protrusion will stick out at the back. That is then sanded flush with the stern. 

 

176.jpeg

177.jpeg

 

 

 

To make sure the placement of all stern parts is exact so the rails run around the rear and onto the quarter galleries, it' VITAL that we work from the top, downwards. The main, inner stern is first temporarily clamped into place. It pays off to get this in exactly the right position. When it is correct, the stern will be 2mm above the bulwark, and the inside edge of the outer window will sit flush with the quarter gallery frames that are also clamped into place. The bottom MDF quarter gallery frame will also angle in line with the bottom of the stern. Lastly, the shelf we fitted just earlier, should sit slightly below the height of the lower window frame. It's a lot to adjust, but trust me, this is the best way of doing it.

179.jpeg

 

 

 

The middle counter is now positioned directly underneath this. Some bevelling is done to make sure it fits snug against the upper stern. The bottom edge of this part will sit at the point where the stern flows into the lower curve. If it doesn't, this part can be trimmed slightly. Pins are now used to hold this in place. Again, NO GLUE!

181.jpeg

 

 

 

The bottom stern counter can now be fitted. This was first soaked and allowed to dry around a tin so that it had a gentle curve that would take the strain off the next task. The counter is pushed up directly underneath the middle counter and the bottom edge of this part is marked with a pencil. My prototype varies very slightly to the production kit, and that will be reflected in text in manual. I now cut along the pencil line and remove the planking from above that line.

183a.jpeg

183b.jpeg

 

 

 

The lower counter is now glued and pinned and into place.

184.jpeg

 

 

 

The upper parts are now removed as adding them at this stage will mean they'll get snagged. The lower counter is now shaped into the hull.

185.jpeg

 

 

The prow underwent its third revision to cater to the figurehead, and this new part was now glued into place on the hull.

187.jpeg

 

 

 

Next, the lower keel parts are added...

189.jpeg

  • Like 3
Link to comment
Share on other sites

  • Administrators

The rest of the keel is now added, and then the rudder post is fitted with its engraved facings and installed. This part sits into the notch in the keel and pushes tight up against the inner stern construction. No clamping needed!

190.jpeg

194.jpeg

 

 

 

The rest of the keel and prow engraved facings are added and copiously held with clamps. You can never, ever have enough of those.

198.jpeg

 

 

 

The second layer of timber starts by fitting the outside forecastle bulwarks. When these are dry, the gun port blanks are removed and the hull starts to transform a little.

200.jpeg

201.jpeg

 

 

 

The rear outside bulwarks are now to be fitted. The quarter gallery frames are temporarily clamped into place and the parts glued. Note that I've remove the blank in the fore gun port hole.

202.jpeg

205.jpeg

 

 

The lower, outside counter is now glued, clamped and pinned in place.

207.jpeg

 

 

 

Indy now looks like this. ☺️

208.jpeg

 

 

 

Until next time.

  • Like 3
Link to comment
Share on other sites

  • Administrators

This is only a mini-update as I've been away on holiday. This shows the hull up to completion of second planking, but I have started on sanding this smooth, which will be seen in next update when I've added the wales and done some other stuff.

 

The plan will give a position below each gun port, where a mark will be added. It's here that a plank will be run, from stem to stern. It also gives a nice reference to the upper wale strake which will lie directly over the top.

 

209.jpeg

210.jpeg

211.jpeg

212.jpeg

 

 

The hull is now sheathed in pear. Sanding begins.

213.jpeg

  • Like 4
Link to comment
Share on other sites

  • Administrators

This update shows the basic external finishing of Indefatigable, and at this stage doesn't include the numerous rails etc. that make up the side bulwarks. That's for later in the build.

 

After a LOT of sanding of the second pear planked layer, the gun ports were opened up to their correct size at last. Before using some custom-made sanding sticks for the job, the inner bulwark port openings were trimmed down more or less to the size of the port itself. The sanders were then used to finally clean them up and even out the internal areas. A sharp scalpel was then used to square up any corners properly.

 

DSC_1289.jpg

 

 

 

If you remember, the first pear plank was laid to be in the exact same position as the the upper strip of the wales. Here you can see the mark that indicates the flow of the plane at the prow. The top also aligns with the top of the prow, so that makes it easier!

215-2.jpg

 

 

 

A 4mm wide strip of 1mm pear is now run from the prow to the stern, following that plank line. I used CA gel for this as I didn't want to use any pins on this area. I've left the plank overlong at the rear so you can see where it runs to. The last two gun ports are also partially obscured by the strip.

DSC_1294.jpg

DSC_1298.jpg

 

 

 

Now, three 5mm wide pear strips of 1mm thickness are run directly underneath the 4mm strip, again with CA gel. Once in place, I masked off the area on both sides of the wales and sanded the wales smooth. You'll note that I tapered the lower two planks towards the bow, and the lower one plank at the stern.

DSC_1299.jpg

 

 

 

The gun ports are now cut into the wales, and the wales are finally shaped at the stern. These are shaped from the curve of the stern lower counter, and rounded into the underside of the wale.

DSC_1304.jpg

 

 

Indy now looks like this. The next update will show some internal work underway. 

DSC_1303.jpg

  • Like 5
Link to comment
Share on other sites

  • Administrators

Tiny update as I am doing a few other things in other build areas of Indy too.

 

I now have some colour on the model. I first varnished the exposed strip on the inner bulwarks and then used masking tape before I added paint. For this, I used some Plastikote Red Oxide (same as on the lower fisher hulls) and decanted it from the aerosol so I could airbrush it. The paint was left to de-gas for a few hours. That's important as it'll boil if you try to use or do anything with it when fresh from the rattle can. The paint was then thinned with mr Levelling Thinner, about 60:40 paint to thinner. When completely dry, I airbrushed Tamiya Flat Red over the red oxide. 

 

228.jpg

 

 

After more judicious masking (and masking the ports off from interior), I did the same paint regime for the gun ports. Once dry, everything was unmasked.

229.jpg

 

 

 

The standard kit will be supplied with Red Alder for deck planking. This is a beautiful timber. However, for this, I am using an engraved maple veneer deck. There will be an option for a maple deck, but it's an actual maple deck, not veneer. Fitting the deck will be the same as for this, with a subtle flex and sliding into the rear first, underneath the stern timbers. First though, a test fit should be done and the edges sanded so it lies flat to the bulwark edges. 

230.jpg

 

 

 

The deck was then glued down and left to dry. In the meantime, the main gu deck coamings were masked and airbrushed in Tamiya Flat Black. The grates will be added after the coamings are fitted, so to reduce rigidity when fitting.

DSC_1341.jpg

DSC_1346.jpg

 

 

More soon(ish) 

  • Like 4
Link to comment
Share on other sites

  • Administrators

Ship's stove.

 

 I know I did the for the VM web-shop but this one is now printed in 8K resolution using a different resin which is tough. There are two PE frets with this stove, with a few spares for things like pulleys and eyelets etc. The stove assembly is the same as the one in the shop, but here are some pics of the work.

 

DSC_1369.jpg

DSC_1373.jpg

 

 

 

Tamiya fine primer was used on the stove, followed by Tamiya Flat Black. The stove was then weathered with Uschi van der Rosten steel pigment. At this stage, the chimney and pipe are only sat in position. They'll be glued to the stove later in the build.

DSC_1375.jpg

DSC_1376-2.jpg

  • Like 4
Link to comment
Share on other sites

  • Administrators

Ok, major update time!

 

I've actually had a lot of subassemblies ready for a while, as this log shows, but now it's time for adding them in. What I haven't shown here is the spirketting that I added and fitting the eyelets to the inner bulwark gun positions. You'll have to wait until manual is finished for those! I've had to take about 100 photos these last days and sequence them, with the ones I took ages ago. Ok, first paint is for the coamings, after masking off the garlands and glue area for grates.

 

253.jpg

 

 

Coamings now fitted without grates as they are more flexible for deck curve.

254.jpg

255.jpg

256.jpg

257.jpg

 

 

 

I've probably posted this pic before, but this just shows that the ladders are now being fitted, along with the grates. 

262.jpg

265b.jpg

266.jpg

274.jpg

282.jpg

 

 

 

I pre-assembled the bitts etc in situ, then removed them when dry before painting. These are now added into place for the last time.

284.jpg

285.jpg

  • Like 5
Link to comment
Share on other sites

  • Administrators

And more...

 

Knees(?) now added, as well as a painted brick floor for the stove.

 

288.jpg

291.jpg

 

 

 

And the gun carts now have some colour applied to them, as well as ironwork and wheels. Remember, these won't be fitted with barrels until the model is more or less complete.

298.jpg

299.jpg

300a.jpg

302.jpg

 

 

 

Capstan finally done.

313.jpg

 

 

 

As are the hand pumps.

325.jpg

326.jpg

 

 

 

No one wants to walk down stairs without a safety rope around them!

327.jpg

 

 

 

And the stove makes an appearance.

347.jpg

 

 

 

And this is Indy up to date. Back in the shipyard tomorrow :) 

Untitled-1.jpg

  • Like 4
Link to comment
Share on other sites

  • Administrators

Time for another update. 

This was something I was looking forward to doing. Not covering up all that work I'd just done, but to turn a corner and be able to do it all again for the next layer in the Indy cake.

 

Before I did that, I needed to add the scale-sized cannonballs to the shot garlands. These are done with liquid CA and some thin-ended paddle tweezers that won't knock the previous ball glued into place.

350.jpg

 

 

 

And with that, it's onto the beams. As the upper side will have some timber showing through the deck cutouts, these were totally cleaned of char. The whole upper face was cleaned also because they look much better for the instruction photos.

351.jpg

 

 

 

There are two lengths of pillar, depending on whether they sit on a deck or on a grate coaming. 

352a.jpg

 

 

 

 

All deck beams were painted red, except for the upper side and all the slots. The beam ID is engraved on each beam and this ties in with the engraved number of the deck beam sill. The beams are now slotted and glued into position. Those beams that are supported are continually test fitted with a pillar before being finally glued. Also important to make sure the pillar doesn't push the beam higher than was intended. A steel rule checks this as I go.

353.jpg

356.jpg

357.jpg

 

 

 

The forward beam for the quarterdeck is not only shaped in profile, but also curved across its length. To create this, the beam is made from laminated pear parts, glued together over a jig. When this is dry, the part is cleaned up and fitted into place, sitting atop two of the bitts.

361.jpg

365.jpg

366.jpg

  • Like 4
Link to comment
Share on other sites

  • Administrators

Included in the kit will be a set of optional lodging and hanging knees. It'll be up to you if you want the extra work, but for the manual, I have to take one for the team! These are the hanging knees. The truncated ones are the parts that will be fitted where the gun port would otherwise be obstructed by the longer part. Of course, each part also needs to be specifically shaped to its position. Plenty of spares are supplied.

 

376.jpg

 

 

 

 

Here they are fitted, along with the lodging knees.

377.jpg

 

 

 

 

And the fore deck beams are now added, with the optional knees also installed, followed by the boat beams. These also have optional knees. 

383.jpg

385.jpg

 

 

 

And here she is so far!!

 

388.jpg

  • Like 4
Link to comment
Share on other sites

  • Administrators

A very brief update before the weekend one. 

 

The office furniture has been painted by a friend of mine, and here it is. The round table will not be included with Indy, but the other table will, along with a couple of chairs. Here you can see a couple of incarnations of the furniture, 3D-printed and painted with oils. My friend also added the navigation charts for some extra effect!

 

tables.jpg

 

These items, including the round table are available already though. https://vanguardmodels.co.uk/product/cabin-furniture/

  • Like 3
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...