  1. Hi all, I realized that the fuselage rear decking panel was incorrect. I made it such that the front edge butted up against the rear of the pilot's seat support frame. In fact the decking seems to have passed over the seat frame, forming the rear cockpit surround, then onto the top of the cockpit side frames. After several tries and five broken bracing wires, I think it's just about there now. Now onto making the padded rim to fit around the cockpit rear decking and after that, the machine guns, Mike
  2. Hi all, The fuselage bottom cross bracing is done, which completes the fuselage bracing. Also the tail skis has been fitted, with 0.125 mm copper wire suspension springs and 0.2 mm lead wire retention cable. Now it's onto making the cockpit surround padding and fit the two modified 'Gaspatch' machine guns with their synchronization cables, Mike
  3. Hi all, The fuselage rear decking panel fitted. Now to cross brace the bottom fuselage frames, then it's onto the tail skid assembly, Mike
  4. Hi all, The fuselage side frame bays are now cross braced. Now to make and fit the top decking panel and finally cross brace the bottom fuselage frames, Mike
  5. Hi DocRob, Yes a lot of rigging to the fuselage and flight controls. Thankfully the Fokker D.VII has little external rigging and only cross bracing and aileron control lines in the upper wing. Hi all, The top fuselage frames are cross braced. Onto the sides now, then the make and fit the top decking panel and finally cross brace the bottom fuselage frames, Mike
  6. Hi all, Rigging has started now. Difficult to make out some of the rigging as I had to tie back the flight control lines as they were getting in the way. So far: Double bracing across the top of the fuel tank. Double bracing across the underside of the cockpit floor (2 sets). Double bracing across the frame bays adjacent to the pilot's seat. Double bracing across the rear of the pilot's seat support frame. Double bracing across each vertical fuselage frame. Done with 0.08 mm Mono-filament, 0.4 mm Nickel-Silver tube and 1:48th scale turnbuckles ('Gaspatch'). The same needs to done on each of the frame bays on each side of the fuselage as well as those under and on top of the fuselage. Mike
  7. Hi all, The front end gas been weathered up a bit to keep it aligned with the associated Fokker D.VII model. It's ready now for cross brace rigging and the fitting of the twp machine guns with their synchronization drive cables, Mike
  8. Hi all, Radiator side stays fitted, Mike
  9. Hi all, Radiator flap control now fitted. Made from micro-tube (0.4 mm and 0.1 mm diameter), photo-etch pulley and 0.125 mm copper wire for the loop handle, Mike
  10. Hi all, Radiator with photo-etch front and rear cooling core and scratch made pilot operated flap (to control engine cooling), Mike
  11. Hi all, Generator lead and seat connector fitted. Generators were not standard fit, but were installed to some aircraft to power heated flying suits later in WW1 and if carried, wireless transmitters. Made from 0.4 mm diameter Nickel-Silver micro-tube and 0.148 mm diameter match line. Mike
  12. Hi all, Control cable for the hand operated throttle added. Lead wire 0.2 mm diameter, from hand throttle on the control column, down and under the floor, up side frames and across the throttle quadrant. Then down the other side, under the floor and back up to the hand throttle. Mike
  13. Hi all, Throttle control run added from pilot's throttle lever to the linkage on the dual carburettors. Scratch made from 0.1 mm Nickel-Silver rod and 0.3 mm brass tube with the pivot lever created from 'spare' photo-etch, Mike
  14. Hi all, 'Spark Advance' control (Ignition Timing) fitted from cockpit lever to engine magnetos linkage rod. Made from 0.3 mm brass tube, 0.1 mm Nickel-Silver rod and scratch link. Mike
  15. Thanks Jeff - I try I use the internet and various publications: Osprey Aircraft of the Aces - Fokker D.VII aces Part 1-2 (Norman Franks/Greg VanWyngarden). Albatros Productions - Windsock - Data file No.9 - Fokker D.VII (P.M. Grosz). Albatros Productions - Fokker D.VII Anthology 1, 2 and 3 (Ray Rimell). Kagero Publishing - Fokker D.VII The Lethal Weapon (Tomasz J. Kowalski and Marek Rys). Wingnut Wings - Instruction manual (Kit No.32027). Windsock Modelling Special No.3 - Building the Fokker D.VII (Ray Rimell). Various online resources (e.g. Wikipedia and the Aerodrome forum). Albatros D.III - Osprey Publishing (James F. Miller). Mike
  16. Hi all, Leads fitted from the magneto starter behind the instrument panel to both engine driven magnetos, Mike
  17. Hi all, Tachometer drive added from gun synchronization mechanism. The two carburetor fuel feed pipes from the gallery behind the instrument panel, The two machine gun trigger cables from the control column to the gun synchronization mechanism, Mike
  18. Hi all, A few more things added: Fuel lines from the underside of the fuel tank to the fuel gallery behind the instrument panel. Grease line from the pilot's 'screw down' pump to the engine mounted water pump. Fuel drain line from the underside of the fuel tank to outside of the fuselage bottom. Oil line from the oil tank (in the fuel tank) to the engine driven oil pump. Now it's onto the wiring up the magnetos and adding the throttle and spark advance (ignition timing) controls, Mike
  19. Hi all, It might make it on the Great War SIG display. The pilot's hand operated fuel pressure pump pipe is done. Also the rear gun support frame and the instrument panel are fitted, Mike
  20. Hi all, The pilot's seat and support frame now fitted, Mike
  21. Hi all, Now things start to get complicated, Mike
  22. Hi all, I've started on the cockpit pipework. The pipe connections under the fuel tank. Behind the instrument panel is the fuel valve manifold (made of micro-tube) connected to the pilot's four selectors. Two pipes out are for connecting the supply from the main and auxiliary fuel tanks. From the bottom of the manifold will be the two supply pipes to the engines duel carburetor. Electrical cables added to the rear faces of the starter magneto and ignition switch. Mike
  23. Hi all, Cockpit floor with controls and seat done, Mike
  24. Hi all, Well time to start the fuselage build with controls, pipework etc, Mike
  25. Hi all, The kit supplied fuselage side frames married to the 3D printed fuselage. This required cutting both, as both have a pilots seat frame and only one can be used of course. As the join between the two could be a weak area, I chose to fit them together using brass micro-tube. This gives more rigidity to the join of the fuselage and allows the fitting of the pilots seat frame from the kit (part A26), Mike
×
×