Jump to content

Recommended Posts

Posted

Starting a new diorama. It will be a 1/35 German rail yard. It will have three rail lines, a switch tower, a loading dock, two steam engines, several flat cars with military equipment and several freight cars. I am working on the switch tower now. 
 

image.thumb.jpg.edb2138031fe49204128e15107e2f67c.jpgimage.thumb.jpg.91ffc75ee4b9cee7fcbe808ae3bd0abb.jpgimage.thumb.jpg.8878e19f2b6058803d2b3230fe05e3b3.jpgimage.thumb.jpg.22872eb59e1393a23b2fd4dc7c5fe6fb.jpg

  • Like 6
Posted

Another one to follow … :popcorn:

FYI, « Le Train » is the title of a French film telling the story of the mass arrest of Jews in the « Rafle du Vel D’Hiv » in France in 1942, and their subsequent deportation to Auschwitz / Birkenau … Your thread title just jumped at me for that reason …

Hubert

 

  • Like 2
Posted

It’s also the name of a Burt Lancaster film regarding the artwork stolen from France by the Nazis. 

  • Like 2
Posted

At Lowe’s you can get a 4x8 sheet or 2x2 panels. Home Depot also sells the 2x2 panels. 

  • Like 3
Posted

I will add a pedestrian bridge from the second floor of the switch tower across all three tracks. There will also be a small maintenance shed. 

  • Like 3
Posted

Should be a great diorama. Will surely follow. If I might make a suggestion; you might wan't to rotate the whole setup a few (10 / 15 degrees) in relation to the base. This way you get a much more interesting setup to look at. And maybe if you can get your hands on one, add a switch between the tracks.

  • Like 2
Posted

Unfortunately I have a small area to work with. From my experience, angling multiple structures within a limited space gives the diorama a cramped feel which I don’t want. This would also shorten the length of the three track lines. Most rail yards are typically linear. If I was only going to display the tower or if I had a larger surface to work with I would be in agreement. As for the switch that would have to be scratch built. 

  • Like 2
Posted

Here are a few of the kits I will be using. Still waiting on a tanker and two gondolas. Might add two more box cars. Going to buy two more locomotives. 
image.thumb.jpg.a0251b8ca3f3123ddd8e883b3e2241e3.jpgimage.thumb.jpg.c2c4a90e9055be1f93ba53335e54d174.jpgimage.thumb.jpg.5e4900610ef6fb5f4e2c092906cabe8e.jpg

 

  • Like 6
Posted

Waiting for more track and platform crane. Going to curve a portion of the track. Waiting for maintenance shed. There will be a stairwell connecting the walkway with the tower. Still need to finish the walkway railing. image.thumb.jpg.d3c8b7f33ae18989b71b25e5301c4cc2.jpgimage.thumb.jpg.6cdf457bd84e26b60a0d48eec6539e4d.jpgimage.thumb.jpg.e1533a0cdbb22b422219e39a61f89fc8.jpg

  • Like 4
Posted
2 hours ago, CP1 said:

Waiting for more track and platform crane. Going to curve a portion of the track. Waiting for maintenance shed. There will be a stairwell connecting the walkway with the tower. Still need to finish the walkway railing. image.thumb.jpg.d3c8b7f33ae18989b71b25e5301c4cc2.jpgimage.thumb.jpg.6cdf457bd84e26b60a0d48eec6539e4d.jpgimage.thumb.jpg.e1533a0cdbb22b422219e39a61f89fc8.jpg

Nice! Also approved by pink panther👍😅

  • Haha 3

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...