Jump to content
The Great LSM Twins Group Build ends July 3, 2024 ×

Tristar #35040 1/35 Sturmpanzer IV Early Version [MId. Production]


Recommended Posts

Group build #2 off and running.

The Tiger 1 is basically complete bar a few tools to add. Then it’s lined up for the spray booth. With summer here “at last” in the UK I do enjoy modelling “al fresco” no that’s not rude.........So with this in mind I turned to the Tristar 1/35 Sturmpanzer IV Early Verizon - Mid Production....

As some of you may remember I posted this pic back in end of April in response to Martins “what’s on your bench”

74BB7595-569B-4362-8D73-A4DC1F866EB0.thumb.jpeg.5c9217c767d8e7575742347b0fa59988.jpeg

 

In doing some research today, it transpires that Sturmpanzer’s did participate in Normandy around about August..........

 

56378469-6B6B-4407-93B3-D597C79F9012.thumb.jpeg.845b036818732a3247637ba9c1429679.jpeg

So only having done the wheels back back in April, I’d like to enter this as my second contribution to the GB.........typically Tristar there are a mountain of sprues and part count around 500.......including individual tracks.

55171B4F-6769-4BFD-818C-FBA4088FABAA.thumb.jpeg.86e322b72bb327411c541630ae669787.jpeg

 

I await the judges decision........

  • Like 4
Link to comment
Share on other sites

Oh, I do love a mobile pillbox. These things are the ultimate triumph of function over appearance.

Not sure where the details above came from Phil but they must have taken a helluva detour to make it 110 miles from Conde-sur-Noireau to the front. We've holidayed around there a few times and it's at most 60 miles to the beaches. The Suisse Normande is a lovely area.

  • Like 2
Link to comment
Share on other sites

  • 3 weeks later...

Ok so now the vacation is finished and the nights are drawing in, its time to get back to the bench. The odds and sods of the Tiger are time consuming so I dipped into the Sturmpanzer to get some building done.

The kit is surprisingly good for Tristar even though the instructions are rubbish. Anyhow here is the start of the build......

FC883933-8A26-4CDC-87CA-1DC4A4529E53.thumb.jpeg.7fd262a842d3185db3f3eebdb45c6727.jpeg

 

Seven parts times eight assemblies , that was time consuming.......

BED93AE0-EAF4-4BDB-9026-199D7EFABBB5.thumb.jpeg.ecbe59d39c14ac4441816f51685f8af7.jpeg

 Lower hull attachments and rear deck........the road wheels are two wheels per suspension arm and Tristar supply rubber tyres.........

Next task.......

E60425DE-1F92-461F-8D94-A1FA0CBB8273.thumb.jpeg.bac19725687c2d868a50e78672d0bf49.jpeg

more soon, back to the Tiger..........

  • Like 5
Link to comment
Share on other sites

Agreed... cleaning up those track parts, even without the assembly process, is going to be time consuming in itself.

On 8/27/2019 at 7:16 AM, GusMac said:

Not sure where the details above came from Phil but they must have taken a helluva detour to make it 110 miles from Conde-sur-Noireau to the front. We've holidayed around there a few times and it's at most 60 miles to the beaches. The Suisse Normande is a lovely area.

I would not be at all surprised. Patrick Agte in his Stackpole Publishing book on Wittmann gives an account of an UshFührer Warnrcke, who detoured his entire Company to a Paris Restaurant owned by a good friend on the night of June 8th for a lavish meal on the house.

Urgency seems not to have been a priority for the Germans on the Invasion Front.

  • Like 3
Link to comment
Share on other sites

  • 2 weeks later...
  • 5 weeks later...
  • 1 month later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...