Jump to content
Playing in the Sandbox Group Build Sept 1, 2024 - Jn 1, 2025

converting the HK Models prototype Lancaster into a Manchester.


Recommended Posts

Been doing some work on the elevators. They have been broken off three times already so it was time for a permanent solution using steel pins.

Drilling holes and insert there, there, etc.

Hinges will be made from plasticcard to hide the pins.

Cees

image.jpeg

image.jpeg

  • Like 2
Link to comment
Share on other sites

Made progress on the two fins and rudders. Rescribing the panellines and pinning the rudders set at an angle. Very sturdy too.

The elevator trimtabs need to be added next.

Tailsection is well underway towards completion.

Cees

image.jpeg

image.jpeg

  • Like 3
Link to comment
Share on other sites

I deleted all my pics from photobucket. No more energy spent on those a-holees. I tried deleting my account but evertime I hit

the enterbutton it didn't work.  :angry: Getting another host makes me wonder if they won't

follow the same route at some point. For the time being I stick to posting pics on LSM only.

  • Like 1
Link to comment
Share on other sites

  • 4 weeks later...

Nice problem Cees. Anytime I try to go on Netflix one of the kids has always got there first! Still, the elder one will be off to Uni soon. Haven't told her but I might turn her bedroom into a modelling space.

Link to comment
Share on other sites

  • 2 weeks later...

Thanks,

Here are the pics as promised.

As the nose section will be quite dark I will only represent the basic shapes such as the automatic pilot " footballs" and the camera.

The flight engineers collapsible seat has been made as well and it even works up and down. The seat back still needs to be made. Some of the already made parts such as the navigators table and mounting for the R1155/t1154 set up have been modified to make painting easier and reduce the number of loose parts.

Getting there.

Cheers

Cees

image.jpeg

image.jpeg

image.jpeg

image.jpeg

image.jpeg

image.jpeg

  • Like 2
Link to comment
Share on other sites

  • 3 months later...

Yes yes I know, it's been a while but work is about to re-commence again during the Christmas period. I'm itching to do more work on it. Detailing the cockpit is a hell of a job (especially if you do not like detailing the really small bits) but will get there in the end.

I feel the Lancaster will be sooner out than the Manchester is finished but that is no problem. For 2018 I intend to get it mostly finished (famous last words hehe).

Cheers

Cees

  • Like 2
Link to comment
Share on other sites

  • Administrators
On 20/12/2017 at 7:21 AM, Wingco57 said:

I feel the Lancaster will be sooner out than the Manchester is finished but that is no problem. For 2018 I intend to get it mostly finished (famous last words hehe).

You can guarantee it will be finished before anything rolls out of Erik's workshop! ;) 

  • Like 1
Link to comment
Share on other sites

  • 1 month later...

Snallish update, looong overdue I know but during the ipms modelling afternoon last saturday I got the itch to get started again and made the throttle box pedestal. This is totally different comoared to the Lanc as it has a bras lampswitch embedded in it I felt really needed to be installed. Took some hours but modelling and talking doesn't speed up things. Also made a start with the instrument panel. This is also completely different so this will be built using pe dials etc. After the instrument panel is finished the painting stage comes closer.

Cheers

Cees

image.jpeg

image.jpeg

image.jpeg

image.jpeg

  • Like 8
Link to comment
Share on other sites

  • 1 month later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...