Jump to content
Playing in the Sandbox Group Build Sept 1, 2024 - Jn 1, 2025

Hs129B2/R3


Recommended Posts

  • Administrators

Aaalmost done. Well… with the Kettenkraftrad that is.

The tracks were a proper pain in the ass. They are lovely detailed but the connections are so loose, it’s almost impossible to fix the entire track.

 

E4752E57-3FC2-45D0-B256-9A372DF5FE8B.jpeg

D98F37B9-E58A-4138-A0B4-836B29D0B142.jpeg

7240D9AA-3E75-4AA7-8068-0B55811B09EC.jpeg

  • Like 8
  • Thanks 2
Link to comment
Share on other sites

  • 2 weeks later...

Very nice, I guess the paddles on the Kettenkrad's tracks are not helpful during the assembly.  The Henschel looks great and as a compensation for the tedious track work, you have a twin engine design, which avoids Zoukei Mouras back breaker, the engine to fuselage to wing mount on the single engined ones.

Cheers Rob

  • Like 2
Link to comment
Share on other sites

  • Administrators

Closed the fuse. All riveted. Basic rlm02 on the wingroot area. Trying to figure out what the best sequence.

At the same time working on a me262 1:1 panel with authentic instruments.

 

 

 

IMG_1576.jpeg

IMG_1577.jpeg

IMG_1549.jpeg

  • Like 4
  • Thanks 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...